GB3WB Wind Turbine Modifications

GB3WB Wind Turbine Modifications. The GRP blades have now been balanced. New tail pivot spring brackets have also been fitted. A second 12 way slip-ring has been fitted inside the main 3 phase slip-ring so that other equipment may be fitted onto the turbine to monitor its preformance or send other data. At the moment LED’s have been fitted to each circuit to test them.

Leave a Reply

Your email address will not be published. Required fields are marked *